Mavenlink Walkthrough
  • 1 Minute to read
  • Dark
    Light
  • PDF

Mavenlink Walkthrough

  • Dark
    Light
  • PDF

Article Summary

Prerequisites

  • Mavenlink Connection

The reports in Mavenlink are grouped into several endpoints, such as the project-based, and custom fields based.

All reports have time dependency where an interval of time is needed. All reports have one or more filters that you can use, furthermore, Mavenlink allows filtering by one of the available time fields found in a list of options in each report.

All the time-dependent reports can be set using Rivery's built-in time functionalities:

Time-Dependent Reports

Select a time period:

Time-dependent reports support two kinds of time-period:

  1. Date Range -
    • Pulls data in the date range between the start and end date provided, including the end date.
    • You must select a start date.
    • Leaving the end date empty will pull data according to the current time of the river's run.
    • Select a timezone offset to send dates considering the offset.
    • Use the "Last Days Back For Each Run" to expand the start date and pull data a given number of days back before the chosen start date.

In the example above the river will run with a date range between "01/03/2020" and "30/03/2020".

  1. Predefined date - A date range defined by Rivery:
    • Day - Yesterday.
    • Week (From Monday to Sunday) - Week to date, Previous week, Previous week to date.
    • Month - Month to date, Previous month, Previous month to date.