RVR-SAPC-506
- 1 Minute to read
- Print
- DarkLight
- PDF
RVR-SAPC-506
- 1 Minute to read
- Print
- DarkLight
- PDF
Article summary
Did you find this summary helpful?
Thank you for your feedback
Issue Summary:
- The error "MISSING_START_DATE_OR_END_DATE" with Error Code: RVR-SAPC-506 indicates that either the start date or the end date is not provided in the configuration for the Data Connector 'sapconcur'. This happens because at least one of these fields is mandatory for data extraction. This start and end date setup is important as it specifies the period for which the data is to be retrieved.
Action Steps:
- Check Configuration: Ensure that both the start date and the end date are specified in your Rivery configuration for the sap-concur data connector.
- Specify Dates: If your data extraction is intended for a specific period, explicitly set both the start and end dates in the format DD/MM/YYYY.
- Empty End Date: If you want the data to be pulled up to the time of the river run, ensure to leave the end date empty, as Rivery will automatically fetch data up to the current time when executed.
- Review Timezone: Verify that the timezone is set correctly if date discrepancies are suspected. Dates should be in UTC to ensure accurate data pulling.
- Date Format Compliance: Ensure the date format used in the configuration matches the required format (DD/MM/YYYY).
- Incremental Extraction: If you are using incremental data extraction methods, ensure that all required configurations like start date/value are properly set as they are essential in defining data retrieval intervals.
External References:
- For additional documentation or assistance, consider visiting the Rivery documentation: Rivery Documentation or specific documentation for SAP Concur if needed.
If the issue persists or you need further assistance, please open a ticket with Rivery support.
Was this article helpful?