RVR-SFM-113
  • 1 Minute to read
  • Dark
    Light
  • PDF

RVR-SFM-113

  • Dark
    Light
  • PDF

Article summary

  1. Issue Summary

    • The error "Invalid date format, end date precedes start date" with error code RVR-SFM-113 pertains to a situation where the end date set for a data retrieval operation occurs before the start date while using the Salesforce Marketing (sf_marketing) data connector in Rivery. This indicates a misconfiguration in the date inputs, as the end date must always follow the start date chronologically.
  2. Action Steps:

    • Verify Date Inputs:

      • Ensure that the date format follows the required format, which might typically be DD/MM/YYYY as per Rivery's guidelines.
      • Double-check the start and end dates in the River settings to confirm the chronological order.
      • If you have set the dates dynamically (e.g., using variables or functions), review their evaluations during the River runtime to ensure they produce valid, logical ranges.
    • Adjust River Configuration:

      • Go to the River's configuration settings in Rivery for the sf_marketing data connector.
      • Correct the end date to be equal to or later than the start date.
  3. External References:

If the issue persists or you need further assistance, please open a ticket with Rivery support.


Was this article helpful?

What's Next