RVR-YR-002
- 1 Minute to read
- Print
- DarkLight
- PDF
RVR-YR-002
- 1 Minute to read
- Print
- DarkLight
- PDF
Article summary
Did you find this summary helpful?
Thank you for your feedback
Issue Summary
- Error Code: RVR-YR-002
- Error Description: Wrong date range type.
- Data Connector: YouTube Reporting
- Diagnosis: This error typically occurs when an invalid date range is set in the YouTube Reporting data connector in Rivery. The connector expects the date range to follow predefined formats supported by the API.
Additional context: Date ranges can be critical for fetching data within correct time limits, and discrepancies might cause failures in the data pipeline.
Action Steps:
- Check Date Range Format: Verify that the date range format used is compatible with what the YouTube Reporting API expects. Ensure both start and end dates are specified correctly in the acceptable format.
- Use Predefined Date Ranges: Consider using predefined date ranges provided by Rivery if the custom date range setup is causing issues. Options include Day (e.g., Yesterday), Week (e.g., Week to date), Month (e.g., Month to date), or Year to date.
- Adjust Timezone Options: Ensure the timezone setting in the function corresponds with the date range expectations, as discrepancies might contribute to errors.
- Backend Query Adjustments: If working with incremental loads, specify if the inclusive end date expression should be used to include the last day.
External References:
- More information about setting up YouTube Reporting in Rivery can be found in the Rivery documentation.
If the issue persists or you need further assistance, please open a ticket with Rivery support.
Was this article helpful?